Patient, calm and enthusiastic staff working as a team will
achieve the best Al results
Batch farrowing can place an unacceptable burden on the
three serving days if there are only limited staff numbers
available to carry out the Al process
Insemination cannot be rushed and must not become a
"chore"
Inexperienced operators should receive on-the-job
training in principles and technique
Pregnancy detection is an integral part of theinsemination
process as returning sows need to be identified
immediately and appropriate action taken
Climatic conditions both inside and outdoors can dramatically influence reproductive rate. Sows must he kept in warm, dry and draught-free conditions with freedom from stress
Attention todetail, with recording and detailed analysis of accurate records, can go a long way to identifying the problem areas in an Al system.